Ideal Welders received a Gold Medal of Recognition for the modular design, manufacture and installation of the Bobsled / Luge Run for the 2010 Olympics in Whistler, BC.

MUNICIPAL

MUNICIPAL
Read More
Fabricated and installed a 120-inch diameter tunnel liner for a watermain inside the Coquitlam Lake tunnel at the Coquitlam Dam.
Read More
Fabricated and installed a 1.5 km stainless steel watermain with a 120-inch diameter, as well as all necessary valve stations along Pipeline Road. Fabrication included all coatings and testing.
Read More
Ideal Welders was the general contractor for the tunneling, civil works, fabrication and installation of a 42-inch diameter watermain underneath Highway #1 on the south side of the Iron Workers Memorial Bridge.
Read More
Fabricated and installed a 42-inch diameter watermain under the Fraser River. Project included the river pull, tie-ins and related valve stations.