Ideal Welders received a Gold Medal of Recognition for the modular design, manufacture and installation of the Bobsled / Luge Run for the 2010 Olympics in Whistler, BC. |
MUNICIPAL

Fabricated and installed a 120-inch diameter tunnel liner for a watermain inside the Coquitlam Lake tunnel at the Coquitlam Dam. |
Fabricated and installed a 1.5 km stainless steel watermain with a 120-inch diameter, as well as all necessary valve stations along Pipeline Road. Fabrication included all coatings and testing. |
Ideal Welders was the general contractor for the tunneling, civil works, fabrication and installation of a 42-inch diameter watermain underneath Highway #1 on the south side of the Iron Workers Memorial Bridge. |
Fabricated and installed a 42-inch diameter watermain under the Fraser River. Project included the river pull, tie-ins and related valve stations. |