Description

Complete shop fabrication, assembly and field installation of a major valve chamber for the Corporation of Delta

Key points

  • Pre-assembled in shop to ensure proper fit of all flanged joints and accessories
  • Scope of project included module design, supply, fabrication and installation

Benefits

  • Considerable time and money savings due to pre-assembly in shop

Ideal Welders has installed a 120-inch diameter tunnel liner for a watermain inside the Coquitlam Lake tunnel at the Coquitlam Dam. Project highlights include the installation of a 1.5 km stainless steel watermain with a 120-inch diameter, as well as all the necessary valve stations along Pipeline Road. Further, Ideal was  the general contractor for the tunneling, civil works, fabrication and installation of a 42-inch diameter watermain underneath Highway #1 on the south side of the Iron Workers  Memorial Bridge.

Supply and fabrication of over 100 fittings up to 120-inch diameter for the Coquitlam UV Station Upgrade Project

History

Ideal Welders has been the contractor of choice for Metro Vancouver for over 40 years. Our ability to provide a cost-effective product on time and on budget has earned Ideal a reputation as a company that is capable of meeting deadlines. Our innovative and practical modular approach to design and fabrication often results in improved conceptual designs and project execution, as well as considerable cost savings.

Fabrication and installation of valve chamber for Metro Vancouver

Metro Vancouver Valve Chamber

Pictured right is a valve chamber that was fabricated for Metro Vancouver and installed in the North Vancouver area. Ideal Welders designed the modules for the chamber, supplied material, fabricated, coated, tested and installed the chamber in the field.

The entire valve chamber was pre-assembled in our shop to ensure proper fit. The unit was then parceled into manageable sized components for transport to the site.

120-inch diameter tunnel liner

Metro Vancouver, Coquitlam, BC

Fabricated and installed a 120-inch diameter tunnel for a watermain inside the Coquitlam Lake tunnel at the Coquitlam Dam

1.5km Stainless Steel watermain

Metro Vancouver, Coquitlam, BC

Fabricated and installed a 1.5 km stainless steel watermain with a 120-inch diameter, as well as all necessary valve stations along Pipeline Road. Fabrication included all coatings and testing.

42-inch watermain underneath Highway #1

Metro Vancouver, Vancouver, BC

Ideal Welders was the general contractor for the tunneling, civil works, fabrication and installation of a 42-inch diameter watermain beneath Highway #1 on the south side of the Iron Workers memorial Bridge.

90-inch by 90-inch "wye"

Metro Vancouver, Vancouver, BC

Fabricated a 90-inch by 90-inch diameter "wye" for the Seymour-Monashee watermain tie-in. Project included supply, fabrication, NDE and coatings.